Vertically, there are 3-4 sublevels in the stope room, with each measuring 12-15m in height. At each sublevel, medium- and deep-hole drill is adopted to construct upward fan-shaped holes, and charging jumbo to put explosives into the holes. Caved ore is discharged by scraper into orepass.
Stable, sharply inclined orebodies with thickness above the moderate level.
Stoping at several working faces, centralized management, high stoping capacity, mechanization, high degree of safety, and good ventilation.
Stoping Method |
Production Capacity (t/d) |
Loss Rate (%) |
Dilution Rate (%) |
Sublevel room and pillar stoping |
200-500 |
10-15 |
10-15 |